project brief was for the supply, installation and project management of a 50m tower and 8 x 4 x 2.6m Equipment Shelter.
The mast and shelter was installed within a period of 30 days, this was made possible by local design, drawing, procurement, manufacture and fabrication, coupled with manpower and expertise.
 |
|
|