AlanDick was called upon to project manage, design, fabricate and install three 40m Radar Towers, Shelters and 7m Radomes - utilised for GMR (Ground Movement Radar) at the Dubai International Airport.The sites were located inside the airport, within meters of the runway. Extreme safety measures were required to ensure the installation work did not interfere with airport operations.
The
project was successfully completed within
the accelerated programme timescale, allowing
the end user to proceed with major expansion
works of the airport.
|
The main challenge of this particular
project was to "fast track" to project
completion. This was made possible by having local design,
drawing, procurement, manufacture and
fabrication. With supervisors working
systematically, overseeing a team of riggers,
the installation was successfully achieved
within record breaking time.
|
|||||||||||||||
|
|
||||||||||||||||
|
|
||||||||||||||||